Bagaimana Melakukan Safety Assessment untuk Rigging dan Lifting di Proyek Minyak Lepas Pantai?

Image Description
Khotima
  • 2025-04-25 08:23:20
  • Updated

Prosedur berdasarkan API RP 2D dan Permenaker No. 9 Tahun 2016:

  1. Lift planning engineering review
  2. Equipment certification verification
  3. Dynamic load factor calculation
  4. Contingency plan untuk kondisi cuaca

Layanan LiftSafe Offshore:

  • Lift director training
  • Non-destructive testing (NDT) untuk sling
  • Motion-compensated lift simulation